- Advertisement -
HomeUncategorizedState will get the gift of long road / 688 km. Will...

State will get the gift of long road / 688 km. Will build highways, add 6 Lok Sabha, will cost 17787 crores

- Advertisement -
- Advertisement -
  • On July 14, Union Minister Nitin Gadkari will lay foundation stone from VC and will inaugurate
  • Deputy CM Dushyant Chautala told that many new highways will be built in the state with an amount of more than 17 thousand crores.

Capital Haryana The state will get the gift of 668 km long road to be built in Savan at a cost of 20 thousand crore rupees. This road will connect the 6 Lok Sabha constituencies of the state. It will cover half Haryana.



At the same time, Punjab and Rajasthan will also be connected. Union Road and Transport Minister Nitin Gadkari will lay the foundation stone of these new highways to be built in Haryana on July 14 through VC. These will cost 17787 crores. While inaugurating three new highways constructed at a cost of 2240 crores. These highways are 190 km long. Union Minister of State for Roads and Transport VK Singh will join Sonepat in this program.    

Deputy CM Dushyant Chautala said that many new highways will be built in the state. These will be made with an amount of more than 17 thousand crores. This will cover 6 Lok Sabha constituencies. On July 14, Union Road and Transport Minister Nitin Gadkari will lay the foundation stone and lay the foundation stone.



They will be launched

  • An amount of Rs 1183 crore has been spent on 4-lane Rohna Hasangarh to Jhajjar section NH-334B. It will be 35.45 km long.
  • An amount of Rs 857 crore has been spent on the 4-lane Punjab-Haryana Border Jind section NH-71. The 70 km long road will connect the areas of Sonepat, Hisar, Sirsa Lok Sabha.
  • An amount of Rs 200 crore has been spent on 2-lane Jind-Karnal NH-709A. It is 85.36 km long. It will also connect Hisar Lok Sabha constituency in addition to Sonepat and Karnal Lok Sabha. 

Also Read: SBI KCC: Farmers get loans at low interest; Learn how you can take advantage of this scheme



6 lane road will be built from Ismailabad to Narnaul

  •  Union Road and Transport Minister Nitin Gadkari will lay the foundation stone of the 6-lane controlled green field road from Ismailabad to Narnaul on July 14. This road will be 227 kilometers long. It will cost 8650 crores. 
  •  NH-152d Road will connect Kurukshetra, Karnal, Sonipat, Rohtak, Bhiwani and Mahendragarh. 
  •  An amount of Rs.1524 crore will be spent on the 4-lane Gurgaon-Pataudi-Rewari section NH-352W. It will be 46.11 km long.
  •  The 4 lane Rewari bypass will cost Rs 1057 crore on Atteli Mandi section-off NH-11, this road will be 30.45 km long. It will connect Bhiwani, Mahendragarh, Alwar and Gurgaon.
  •  6 lane Narnaul bypass NH-148B, NH-11 and Atteli Mandi Narnaul section of NH-11 will cost an amount of Rs.1380 crore, it will be 40.80 km long. It will connect Bhiwani-Mahendragarh together.
  •  The 4-lane Jind-Gohana NH 352A will cost Rs 1207 crore. It will be 40.60 kilometers long. This will be beneficial for the people of Sonepat Lok Sabha constituency.
  •  The 4 lane Sonepat-Gohana section of NH 352A will. An amount of Rs 1502 crore will be spent on this. It will be 38.23 kilometers long.
  •  A 4-lane 40.47 km long road will be constructed from UP-Haryana border to Rohna at an amount of Rs 1509 crore.
RELATED ARTICLES

Most Popular

Recent Comments